Before Pictures
Before Pictures
Construction Waste
This trash was left at the clients home by the previous contractor.
More Construction Waste
More trash left by the previous contractor. (Totally unacceptable)
Kitchen (Sink Area)
Before picture of the kitchen.
Kitchen (Stove Area)
Before picture of the kitchen.
Rear Door
Door threshold was removed for floor clearance by previous contractor, creating a large air gap at the bottom of the door.
Upper Balcony
Balcony was covered with several layers of shingles & had water damage to the sub-straight.
Upper Balcony
Damage to the balcony sub-straight.
2nd Floor Bathroom
Before picture of the bathroom.
2nd Floor Bathroom
Before picture of the bathroom.
Old Firebox
Before picture of the fireplace.
Entryway Deck
Deck paint was missing over most of the surface.
Deck Stairs
Before picture of the stair railing.
After Pictures
After Pictures
Upper Balcony
A new sub-straight was installed.
Upper Balcony
The seams & edges of the new sub-straight were sealed to prevent further water damage.
Upper Balcony (Finished)
Balcony was coated with liquid rubber & a new railing with balusters was installed.
Deck Stairs
Balusters were installed & then the whole deck surface was painted.
Kitchen (Sink Area)
New oak cabinets, double sink with disposal, & crown molding were installed.
Kitchen (Stove Area)
Counter-top is a custom made stone surface & the range is vented through the wall.
2nd Floor Bathroom
New vanity, faucet, toilet, & towel rack were installed.
2nd Floor Bathroom
The tub surround was replaced. A new shower valve, trim & paint complete the new bathroom.
Fireplace
A new remote controlled firebox was installed.
Fireplace
The fireplace was finished with stone panels & custom oak trim.
Fireplace
Tile was installed at the base to create a small hearth.
Rear Door
A new rear door was installed.